PowerBlocks
GuidesComplete ALM: ship Power Platform from dev to prod
Power Platform

Complete ALM: ship Power Platform from dev to prod

The full picture of Application Lifecycle Management on Power Platform — how environments, solutions, flows and data fit together — with links to each detailed step.

The big picture

A reliable Power Platform delivery has four moving parts: environments (dev / test / prod), the app schema (in solutions), the automation (Power Automate flows) and the data (reference vs transactional). Get the boundaries right and releases stop being scary.

Golden rule: author only in dev, promote through test, and never edit production by hand.

The three steps, in order

  1. 11) Set up the deployment pipeline — package the app in a solution and promote dev → test → prod with Power Platform Pipelines (see the deployment-pipeline guide).
  2. 22) Make flows portable — use connection references and environment variables so flows survive the move, then turn them on in the target (see the flows-across-environments guide).
  3. 33) Move the right data — migrate reference/config data with the Configuration Migration Tool or Dataflows, and never copy transactional data (see the data-transfer guide).

Before every production release

  1. 1Take a manual backup of the target environment.
  2. 2Deploy the solution as managed, then validate in test/UAT.
  3. 3Map connection references and environment variables for the target.
  4. 4Run reference-data migration if the schema changed, then turn flows on and smoke-test.

Related guides